Case Study

Home  |   Case Studies  |   Rail

Rail

At Kentin Engineering we are willing to go above and beyond to meet client satisfaction.

Kentin recently had a client that needed urgent resizing of bogie axles. A short turnaround time was essential. We also had to work within the tolerances and surface finishes given to us by our clients. Working within these parameters we re-machined over 50 axles to the new requirements ready to be assembled into bogies in the timeframe given to us.